SAP PP
- Overview of ERP
- About SAP
- SAP Hierarchy Structure
Master Data
- Material Master
- Bill of Material – BOM
- Work Center
- Routing – Different types of Routing
- Production Version
- About ECM – Engineering change Management
Sales and Operational Planning – SOP
- Standard Planning (with standard so76 info structure)
- Planning with the Product Groups
- Planning with the Materials
- Product Group Aggregation and Desegregation
- Creation of Plan and version management
- Transfer of Plan to Demand Management
Master Planning
- Demand Planning
- Creation of PIR (Planned independent requirements)
- Planning Strategies
Planning Material Requirement
- Master Data requirements in MRP
- Carrying MRP Procedure MRP, MPS, CBP
- Difference between MRP Vs MPS
- Control indicators Processing like NETCH, NETPL, NEUPL
- Evaluation of planning results and planning table
- Master Production Scheduling planning run (MPS RUN)
- MRP Run In Background for all network Plants
- Processing Planned orders
- Planned orders conversion
- Production Orders from planned orders
- Production order creation
- Production order confirmation
Goods Movement in PP
- Goods Receipt wref to Production Order
- Goods Receipt w/o Production Order
- Goods Issue wref to Production Order
- Creation of GI wref to Reservation
- Restricting Goods Receipt Unless Production Order is Confirmed
Batch Management
- Condition Tables
- Access Sequence
- Strategy Types
- PP Batch Search Procedure
- Batch Status in PP
- Characteristics and class
- SLED In Batch in PP
- Manual And Automatic Batch Display In PP
- Production orders creation using Batch
Variant Configuration in PP
- Variant Configuration in BOM
- Characteristics
- Class
- Classification
- Classification settings in material master
- Maintain Dependency
- Configurable Profile for Material
Availability Check
Availability Check with ATP Logic or Against Planning
Repetitive and Discrete Manufacturing Process
- Master Data Maintenance
- Production versions
- REM Profile
- Backflusing
- REM Backflusing
- MTO and MTS Process
INTEGRATION OF PP WITH OTHER MODULES